Resource Library

Welcome to our resource library. Here you can locate useful information to read online or download for later user. We include articles written by our engineers and regulatory specialists, job aids, case studies, links to view past webinars, presentation slides from our semi-annual user group meetings and other events.

Your search returned 122

Math is hard, why do we need more of it? With the mountains of CEMS data to review, certify, and submit, how can you be sure your data is true, accurate, and complete?

11/10/2017

Gain a fresh perspective from a recent graduate and young professional in the environmental compliance field.

11/7/2017

This presentation will focus on the process NV Energy has been going through, and items companies need to consider, when deciding how to comply with their permit.

11/7/2017

Sometimes the validity of data produced by a Part 60 system can potentially become questionable when “significant maintenance” work is performed on your monitor.

10/26/2017

The latest on Parts 60, 63, and 75 rule revisions & NSPS Electronic Reporting Requirements.

10/26/2017

Troubleshooting steps for when StackVision stops collecting data.

10/26/2017

Steps to troubleshoot some of the most common ECMPS errors seen in support.

10/25/2017

Slides from all presentations at the Spring 2017 User Group in Dallas, TX.

5/19/2017

Darrell Bayless with Hoosier Energy will discuss the "why, when, and how" of Appendix E tests, why/when you have to do them, how you do them, and how you enter them in StackVision.

5/18/2017

With both continuous and sorbent trap systems installed on ten coal fired stacks, LG&E and KU are in a unique position to compare the performance between each Mercury monitoring system.

5/18/2017

Join Westar Energy's Jeremy Duis to learn why Part 60, 63, and 75 calculations and reports are different for each of the various programs.

5/18/2017

Join ESC's Jon Konings to discuss strategies in preparing for a regulatory audit.

5/17/2017

A look at operating days and how they are different than Part 75 - also a look at the PM Downtime Report and the significance of 1-hour vs. 30-day intervals.

5/17/2017

The latest on Parts 60, 63, and 75 rule revisions & NSPS Electronic Reporting Requirements.

5/17/2017

A discussion on steps to implement push polling in the 8864 data controller and how to display real-time data on the dashboard.

5/16/2017

A discussion of the top ten issues support agents troubleshoot and how you can avoid them.

5/5/2017